I finally got started on demolition work in the master bathroom in our house. I had to install a Zip Wall to keep the dust out of the adjoining bedroom and house. Then I removed the window in the bathroom so that I could throw all of the construction waste directly outside instead of tracking it through the house. My plywood and 2×4 storm window works to easily open the window when I am working and close it tight when I am done.
Here are some pictures before the work has started. These pictures will be more dramatic when they are compared to the finished bathroom.
 |
Back to window facing the sinks. Closet is on the right Shower is on the far right |
 |
Looking at the window with bathtub on the right and shower on the left |
 |
The closet shelves |
 |
The double jet tub that we have never used and it does not work. |
 |
Toilet |
 |
Another shot of the tub |
 |
The double sinks |
 |
My home made ZipWall door. I made it from 6 MIL plastic and ZipWall zipper kit. |
 |
ZipWall Zippers |
 |
Taking out the Window |
 |
Taking out the Window |
 |
Taking out the Window |
 |
Taking out the Window |
 |
Window is gone |
 |
Shelves are gone |
 |
Window secured, done for the day. |